| Ref No | 95342646 |
|---|---|
| Body Type | Van |
| Chassis No | 201194****Full Chassis No_will be shown on Invoice |
| Model Code | DAA-HFC26 |
| Grade | Highway Star S-HV Pure NAVI TV, both sliding doors, LED headlights, Emmable |
| Engine model | -- |
| Registration Year/Month | 2014/04 |
| Odometer | 138,030km |
| Displacement | 2,000cc |
| Steering | Right |
| Transmission | Automatic |
| Passengers | 8 |
| Door | 5 |
| Dimension | 16.11 |
| Size | (L)4.77 x (W)1.74 x (H)1.94 m |
| Exterior Color | Pearl |
| Interior Color | -- |
| Drive Type | -- |
| Fuel Type | Gasoline |
| Location | OSAKA |
This is a 8-seat mid-class Nissan minivan. It provides a variety of seat arrangements that can accommodate a large amount of luggage. The interior has sufficient seating capacity to seat everybody comfortably, which makes it also perfect for long-distance trips.
2014 AT NISSAN SERENA DAA-HFC26
This 2014 NISSAN SERENA with the model code DAA-HFC26 is equipped with a 2,000cc Gasoline engine and has a total mileage of 138,030km.
This is a Right hand drive vehicle with Automatic transmission.
This vehicle has the following options installed:
Airbag,Power Steering,A/C,Remote Keyless Entry,Navigation System,Power Windows,Alloy Wheels
Car price of the vehicle is: US$2,895
Comment
--