Japanese Used Cars for Sale. | SBI Motor Japan

Total Cars in Stock83253

2016 NISSAN JUKE DBA-YF15

Mileage
72,700km
Engine
1,500cc
Transmission
CVT
Drive Type
--
Steering
Right
Car Price
US$4,701FOB
3rd party stock
Total Price

ASK

To view the price quote,
please select the destination country and port.

JUKE-0
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
  • JUKE
loading...

2016 NISSAN JUKE DBA-YF15

Mileage
72,700km
Engine
1,500cc
Transmission
CVT
Drive Type
--
Steering
Right
Car Price
US$4,701FOB
3rd party stock
Total Price

ASK

To view the price quote,
please select the destination country and port.

Specifications

Ref No212391971
Body TypeSUV
Chassis NoYF15-50****Full Chassis No_will be shown on Invoice
Model CodeDBA-YF15
Grade15RX_V Selection
Engine model--
Registration Year/Month2016/02
Odometer72,700km
Displacement1,500cc
SteeringRight
TransmissionCVT
Passengers5
Door5
Dimension11.51
Size(L)4.14 x (W)1.77 x (H)1.57 m
Exterior ColorBlue
Interior Color--
Drive Type--
Fuel TypeGasoline
LocationMOJI

Option

  • Airbag
  • Anti-Lock Brakes
  • Power Steering
  • A/C
  • Remote Keyless Entry
  • Navigation System
  • Cruise Control
  • Digital Meter
  • Tilt Wheel
  • CD Player
  • AM / FM Radio
  • DVD
  • Power Windows
  • Rear Window Defroster
  • Tinted Glass
  • Rear Window Wiper
  • Power Door Locks
  • Alloy Wheels
  • Power Mirrors
  • Sunroof
  • Third Row Seats
  • Power Slide Door
  • Leather Seats
  • Power Seats
  • Bucket Seat
  • *SBI Motor Japan shall not be responsible for any preexisting loss, dents , scratch and damages already presented in the photos.
  • *SBI Motor Japan will export the vehicles "As is" unless requested otherwise by the customer.
  • *You need to look up the Import Regulation of your country for this unit..

Comment

--

Order Vehicle

Step1Total car price

Total Price
Loading...C&F + inspect

Step2Inquiry

Please sign in and get a quote!

Recommended Items

NISSAN JUKE Customer Reviews

Reviews(3

2024/01/23
car image

JUKE

Thank you!

Thank you my friend Nathan Contact him anytime +81 80-8376-7245 Good business

Candia Charles

CONGO,THE DEMOCRATIC REPUBLIC OF THE

LIKE(1)
2023/11/14
car image

JUKE

MR/MRS KINGSTAN MUSONDA

Thank You SBI, it has been so great to do business with, and a Big thanks goes to madam Rita , who has been very helpful in eve...

Read More

kingstan musonda

TANZANIA

LIKE(6)
2022/04/19
car image

JUKE

NISSAN JUKE

Hi, just to let you know that i received my car. The vehicle is very nice and in good condition. At first, i was scared be...

Read More

faith

ZAMBIA

LIKE(4)
2024/01/23
car image

JUKE

Thank you!

Thank you my friend Nathan Contact him anytime +81 80-8376-7245 Good business

Candia Charles

CONGO,THE DEMOCRATIC REPUBLIC OF THE

LIKE(1)
2023/11/14
car image

JUKE

MR/MRS KINGSTAN MUSONDA

Thank You SBI, it has been so great to do business with, and a Big thanks goes to madam Rita , who has been very helpful in eve...

Read More

kingstan musonda

TANZANIA

LIKE(6)
2022/04/19
car image

JUKE

NISSAN JUKE

Hi, just to let you know that i received my car. The vehicle is very nice and in good condition. At first, i was scared be...

Read More

faith

ZAMBIA

LIKE(4)
2024/01/23
car image

JUKE

Thank you!

Thank you my friend Nathan Contact him anytime +81 80-8376-7245 Good business

Candia Charles

CONGO,THE DEMOCRATIC REPUBLIC OF THE

LIKE(1)
2023/11/14
car image

JUKE

MR/MRS KINGSTAN MUSONDA

Thank You SBI, it has been so great to do business with, and a Big thanks goes to madam Rita , who has been very helpful in eve...

Read More

kingstan musonda

TANZANIA

LIKE(6)
2022/04/19
car image

JUKE

NISSAN JUKE

Hi, just to let you know that i received my car. The vehicle is very nice and in good condition. At first, i was scared be...

Read More

faith

ZAMBIA

LIKE(4)

Car Information

2016 AT NISSAN JUKE DBA-YF15
This 2016 NISSAN JUKE with the model code DBA-YF15 is equipped with a 1,500cc Gasoline engine and has a total mileage of 72,700km.
This is a Right hand drive vehicle with CVT transmission.
This vehicle has the following options installed:
Airbag,Power Steering,A/C,Remote Keyless Entry,Navigation System,Power Windows,Alloy Wheels
Car price of the vehicle is: US$4,701