Japanese Used Cars for Sale. | SBI Motor Japan

Total Cars in Stock124088

2015 HONDA VEZEL RU3

Mileage
63,390km
Engine
1,500cc
Transmission
Automatic
Drive Type
--
Steering
Right
Car Price
US$8,225FOB
3rd party stock
Total Price

ASK

To view the price quote,
please select the destination country and port.

VEZEL-0
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
  • VEZEL
loading...

2015 HONDA VEZEL RU3

Mileage
63,390km
Engine
1,500cc
Transmission
Automatic
Drive Type
--
Steering
Right
Car Price
US$8,225FOB
3rd party stock
Total Price

ASK

To view the price quote,
please select the destination country and port.

Specifications

Ref No102282677
Body TypeSUV
Chassis NoRU3-111****Full Chassis No_will be shown on Invoice
Model CodeRU3
GradeHybrid Z
Engine model--
Registration Year/Month2015/09
Odometer63,390km
Displacement1,500cc
SteeringRight
TransmissionAutomatic
Passengers5
Door5
Dimension12.26
Size(L)4.3 x (W)1.77 x (H)1.61 m
Exterior ColorOther
Interior Color--
Drive Type--
Fuel Type--
LocationNAKANOSEKI

Option

  • Airbag
  • Anti-Lock Brakes
  • Power Steering
  • A/C
  • Remote Keyless Entry
  • Navigation System
  • Cruise Control
  • Digital Meter
  • Tilt Wheel
  • CD Player
  • AM / FM Radio
  • DVD
  • Power Windows
  • Rear Window Defroster
  • Tinted Glass
  • Rear Window Wiper
  • Power Door Locks
  • Alloy Wheels
  • Power Mirrors
  • Sunroof
  • Third Row Seats
  • Power Slide Door
  • Leather Seats
  • Power Seats
  • Bucket Seat
  • *SBI Motor Japan shall not be responsible for any preexisting loss, dents , scratch and damages already presented in the photos.
  • *SBI Motor Japan will export the vehicles "As is" unless requested otherwise by the customer.
  • *You need to look up the Import Regulation of your country for this unit..

Comment

--

Order Vehicle

Step1Total car price

Total Price
Loading...C&F + inspect

Step2Inquiry

Please sign in and get a quote!

Recommended Items

Car Information

2015 AT HONDA VEZEL RU3
This 2015 HONDA VEZEL with the model code RU3 and has a total mileage of 63,390km.
This is a Right hand drive vehicle with Automatic transmission.
This vehicle has the following options installed:
Airbag,Power Steering,A/C,Remote Keyless Entry,Navigation System,Power Windows,Alloy Wheels
Car price of the vehicle is: US$8,225