| Ref No | 466826421 |
|---|---|
| Body Type | -- |
| Chassis No | JW5-620****Full Chassis No_will be shown on Invoice |
| Model Code | JW5 |
| Grade | Modulo X Version Z |
| Engine model | -- |
| Registration Year/Month | 2022/01 |
| Odometer | 4,650km |
| Displacement | 660cc |
| Steering | Right |
| Transmission | Manual |
| Passengers | 2 |
| Door | 2 |
| Dimension | 5.94 |
| Size | (L)3.4 x (W)1.48 x (H)1.18 m |
| Exterior Color | Other |
| Interior Color | -- |
| Drive Type | -- |
| Fuel Type | Gasoline |
| Location | OSAKA |
2022 AT HONDA S660 JW5
This 2022 HONDA S660 with the model code JW5 is equipped with a 660cc Gasoline engine and has a total mileage of 4,650km.
This is a Right hand drive vehicle with Manual transmission.
This vehicle has the following options installed:
Airbag,Power Steering,A/C,Remote Keyless Entry,Power Windows,Alloy Wheels
Car price of the vehicle is: US$22,691
Comment
--