Japanese Used Cars for Sale. | SBI Motor Japan

Total Cars in Stock91477

2016 HONDA ODYSSEY DBA-RC1

Mileage
68,492km
Engine
2,350cc
Transmission
CVT
Drive Type
2WD
Steering
Right
Car Price
US$8,588FOB
3rd party stock
Total Price

ASK

To view the price quote,
please select the destination country and port.

ODYSSEY-0
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
  • ODYSSEY
loading...

2016 HONDA ODYSSEY DBA-RC1

Mileage
68,492km
Engine
2,350cc
Transmission
CVT
Drive Type
2WD
Steering
Right
Car Price
US$8,588FOB
3rd party stock
Total Price

ASK

To view the price quote,
please select the destination country and port.

Specifications

Ref No559363445
Body TypeVan
Chassis NoRC1-111****Full Chassis No_will be shown on Invoice
Model CodeDBA-RC1
GradeAbsolute X Honda Sensing
Engine model--
Registration Year/Month2016/05
Odometer68,492km
Displacement2,350cc
SteeringRight
TransmissionCVT
Passengers8
Door5
Dimension14.78
Size(L)4.83 x (W)1.8 x (H)1.7 m
Exterior ColorPearl
Interior Color--
Drive Type2WD
Fuel TypeGasoline
LocationOSAKA

Option

  • Airbag
  • Anti-Lock Brakes
  • Power Steering
  • A/C
  • Remote Keyless Entry
  • Navigation System
  • Cruise Control
  • Digital Meter
  • Tilt Wheel
  • CD Player
  • AM / FM Radio
  • DVD
  • Power Windows
  • Rear Window Defroster
  • Tinted Glass
  • Rear Window Wiper
  • Power Door Locks
  • Alloy Wheels
  • Power Mirrors
  • Sunroof
  • Third Row Seats
  • Power Slide Door
  • Leather Seats
  • Power Seats
  • Bucket Seat
  • *SBI Motor Japan shall not be responsible for any preexisting loss, dents , scratch and damages already presented in the photos.
  • *SBI Motor Japan will export the vehicles "As is" unless requested otherwise by the customer.
  • *You need to look up the Import Regulation of your country for this unit..

Comment

--

Order Vehicle

Step1Total car price

Total Price
Loading...C&F + inspect

Step2Inquiry

Please sign in and get a quote!

Recommended Items

Car Information

2016 AT HONDA ODYSSEY DBA-RC1
This 2016 HONDA ODYSSEY with the model code DBA-RC1 is equipped with a 2,350cc Gasoline engine and has a total mileage of 68,492km.
This is a Right hand drive vehicle with CVT transmission.
This vehicle has the following options installed:
Airbag,Power Steering,A/C,Remote Keyless Entry,Navigation System,Power Windows,Alloy Wheels
Car price of the vehicle is: US$8,588