Voitures d'occasion japonaises à vendre. | SBI Motor Japon

Total des voitures en stock107264

2016 LEXUS RX AGL25W

Mileage
66,942km
Engine
2,000cc
Transmission
Automatic
Drive Type
4WD
Steering
Right
Car Price
US$21,544FOB
3rd party stock
Total Price

ASK

To view the price quote,
please select the destination country and port.

RX-0
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
  • RX
loading...

2016 LEXUS RX AGL25W

Mileage
66,942km
Engine
2,000cc
Transmission
Automatic
Drive Type
4WD
Steering
Right
Car Price
US$21,544FOB
3rd party stock
Total Price

ASK

To view the price quote,
please select the destination country and port.

Specifications

Ref No312835400
Body TypeSUV
Chassis NoAGL25-0****Full Chassis No_will be shown on Invoice
Model CodeAGL25W
GradeRX200t F Sport
Engine model--
Registration Year/Month2016/10
Odometer66,942km
Displacement2,000cc
SteeringRight
TransmissionAutomatic
Passengers5
Door5
Dimension15.89
Size(L)4.89 x (W)1.9 x (H)1.71 m
Exterior ColorOther
Interior Color--
Drive Type4WD
Fuel TypeGasoline
LocationHITACHINAKA

Option

  • Airbag
  • Anti-Lock Brakes
  • Power Steering
  • A/C
  • Remote Keyless Entry
  • Navigation System
  • Cruise Control
  • Digital Meter
  • Tilt Wheel
  • CD Player
  • AM / FM Radio
  • DVD
  • Power Windows
  • Rear Window Defroster
  • Tinted Glass
  • Rear Window Wiper
  • Power Door Locks
  • Alloy Wheels
  • Power Mirrors
  • Sunroof
  • Third Row Seats
  • Power Slide Door
  • Leather Seats
  • Power Seats
  • Bucket Seat
  • *SBI Motor Japan shall not be responsible for any preexisting loss, dents , scratch and damages already presented in the photos.
  • *SBI Motor Japan will export the vehicles "As is" unless requested otherwise by the customer.
  • *You need to look up the Import Regulation of your country for this unit..

Comment

--

Order Vehicle

Step1Total car price

Total Price
Loading...C&F + inspect

Step2Inquiry

Please sign in and get a quote!

Recommended Items

LEXUS RX Customer Reviews

Reviews(1

2024/02/04
car image

RX

Thank you!

Deja a lubumbashi Merci beaucoup Nathan

Arsène Kabeya

CONGO,THE DEMOCRATIC REPUBLIC OF THE

LIKE(1)
2024/02/04
car image

RX

Thank you!

Deja a lubumbashi Merci beaucoup Nathan

Arsène Kabeya

CONGO,THE DEMOCRATIC REPUBLIC OF THE

LIKE(1)
2024/02/04
car image

RX

Thank you!

Deja a lubumbashi Merci beaucoup Nathan

Arsène Kabeya

CONGO,THE DEMOCRATIC REPUBLIC OF THE

LIKE(1)

Informations sur la voiture

2016 AT LEXUS RX AGL25W
Cette 2016 LEXUS RX avec le code de modèle AGL25W est équipée d'un moteur de 2,000cc à Essence et a un kilométrage total de 66,942km.
C'est un véhicule de conduite à Droite avec transmission Automatique.
Ce véhicule a les options installées comme suit:
Airbag,Direction assistée,A/C,Télédéverrouillage,Système de navigation,Vitres électriques,Roue en alliage,Sièges en cuir
Le prix du véhicule est: US$21,544